Framing the Second Floor Loft
With the joists installed we are finally ready to lay down the Advantech tongue in groove subfloor from Huber. These guys made short work of this part and had the whole thing done in less than a day along with the basic stair framing.
Thanks to Ariat for sponsoring this episode.
• Shop Ariat.com – http://bit.ly/2vxEYCx
• 10% off first order – http://bit.ly/2O7DlBG